Kurt's Zenith CH-701 - N701LT

Monday, January 26, 2015

H. Stab. Structure (7H0) Ready for Skinning



H. Stab structure(7H0) and attachments drilled, (#40) deburred, and ready for skinning
Posted by Ksatter at 2:03 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Empenage, H. Stab.

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

Ksatter
View my complete profile

Blog Archive

  • ▼  2015 (114)
    • ►  December (2)
    • ►  May (12)
    • ►  April (27)
    • ►  March (31)
    • ►  February (26)
    • ▼  January (16)
      • H. Stab hinge bracket & top skin final preparation
      • 41130 Steel parts to Powder Coating
      • H. Stab. Bottom Skin
      • H. Stab. Structure (7H0) Ready for Skinning
      • H. Stab. Rear Spar layout & mate with Front Spar
      • Layout H. Stab. - Front Spar
      • Complete Invntory and Parts Storage Process
      • Unload & Return Van - Start Inventory and parts St...
      • Load Van & Return Trip
      • Van Rental & Drive to Zenith Factory for Kit Pickup
      • AOA Instrument build complete
      • Researched Viking Engine Installation Video
      • Researched iFlyGPS iPad Air Software
      • CrazedPilot nav/Pos Lights Controller Kit
      • Ordered Viking 110 HP Engine & 701 Firewall Fwd Kit
      • Researched 3-D Parts Printing
  • ►  2014 (28)
    • ►  December (10)
    • ►  November (16)
    • ►  October (2)
Simple theme. Powered by Blogger.