Sunday, February 15, 2015

Elevator Trim Tab


Installed the male-end of a 5-pin waterproof connector on length of 8-wire cable & matching female-end to the 4 wires of the elevator trim servo cable. Cable connector will be located in the aft fuselage (added to aid installation/removal of h. stab & elevator structure mating to fuselage). Added the male-end of a 2-pin waterproof connector to 2 of the remaining 3 wires in the 8-wire cable and matching female-end to the 2 wires of the tail-light assembly ready for mounting in the rudder. The last wire (8th, orange) of the cable is unused. These connectors work well in marine applications and I have several more 2-pin connectors to be used in installing the wing-tip navigation/position lights, angle-of-attack sensor, fuel level transmitters, and possibly a landing light

Friday, February 13, 2015

Install Elevator Control Horn to Complete H. Stab. & Elevator Mating


Elevator Horn (7H5) Mounting

H. Stab., Elevator, & Trim Tab with Controls & Hinges

Final placement of elevator control horn mating elevator to h. stab. Completed several bracing structures on top and bottom of both h. stab and elevator. All a5 rivets. Laid out positioning of outer hinge locations. Drilled hing pins (tough job: 1/16" dia, hole in 3/16" dia. pin). Primed and painted 4130 steel hinge pins, and installed on outer elevator ribs with A5 rivets. Outer hinge plates on h.stab will be drilled out and riveted (A5) at a later time to facilitate dis-assembly of the structure for mounting to aft fuselage.

Thursday, February 12, 2015

Mating the H. Stab. and Elevator Sections

H. Stab. & Elevator - Port/Pilot Side (inverted)

H. Stab. & Elevator - Starboard/Passenger Side (inverted)


Final placement of elevator control horn mating elevator to h. stab. Completed several bracing structures on top and bottom of both h. stab and elevator. All a5 rivets. Laid out positioning of outer hinge locations. Drilled hing pins (tough job: 1/16" dia. hole in 3/16" dia. pin). Primed and painted 4130 steel hinge pins, and installed on outer elevator ribs with A5 rivets. Outer hinge plates on h.stab will be drilled out and riveted (A5) at a later time to facilitate dis-assembly of the structure for mounting to aft fuselage

Wednesday, February 11, 2015

Elevator Controls Installation

Elevator Control Horn (7H5) Installation (top)

Elevator Control Horn (7H5) Installation (bottom)


Initial positioning & installation of elevator control horn. Drilled out to #30 - final assembly will be A5. (Note one AN3 bolt in horn mount to H.stab rear spar. Air drill slipped when drilling out A4 to A5 resulting in concentric A5 hole. Drilled out and replaced with AN3-4 bolt and celastic nut.)

Elevator Riveted & Ready for Horn Installation

Elevator Structure with Trim Tab
Drilled out for A4 rivets, dis-assembled, deburred, applied RustOx corrosion protection, Re-strapped and did final riveting on skinned elevator. Ready to make control horn and end hinge attachment to horiz. stab.

Tuesday, February 10, 2015

Elevator (7H5) Trim & Controls Installation

Elevator Controls Mount Area - Underside

Elevator Controls Mount Area - Topside





Removed elevator straps and skin from structure. Installed elevator trim tab and servo. Laid out and cut away areas for control horn and rudder travel. Re-strapped and clecoed skin in preparation for drilling out to A4 and riveting.

Sunday, February 8, 2015

Elevator Top Skin (7H5)

Elevator Top Skin Installation
Laid out rivet lines and positioned elevator top skin for strapping, drilling, and clecoing (silver).

Saturday, February 7, 2015

Elevator Bottom Skin

Elevator Bottom Skin Initial Alignment

Elevator Bottom Skin Alignment - Note Offset Center-Line

Completed positioning and clecoing (silver) elevator bottom skin in place. Fit looks very good. Removed clecos to layout bottom skin rivet lines.

Install Elevator Center Spar (7H1-4)

Installed the elevator center spar (short, 7H1-4) and remaining ribs in preparation for skinning process

Friday, February 6, 2015

Elevator (7H4) Parts Preparation & Layout


Elevator Center Spar and Main Ribs Installation

Gathered elevator parts & laid out center-lines & rivet locations on spar and ribs. Installed (silver) end and outer-center ribs on spar

Wednesday, February 4, 2015

H. Stab. Center Hinge Install (7H3)

H. Stab. Center Hings & Elevator Control Horn Placement

Located and installed H. Stab portion of the center hinge assembly. A5 rivets throughout

Tuesday, February 3, 2015

H. Stab Ready for Hinge Assemby Install


H. Stab. Assembly (7H5) Skinned (inverted)

Final riveting of H. Stab skin with A4 rivets and preparation of center hinge parts. Laid out locations for center hinge assembly (7-H-5).

Monday, February 2, 2015

Completed H. Stab. (7H3)

Removed copper clecos, deburred all holes, and applied RustOx. Sprayed on the diluted RstOx with the small Kobalt gravity-fed gun. Re-strapped, re-clecoed, and riveted the structure, which is now ready for center center hinge assembly and cutouts for control cables

Sunday, February 1, 2015

H. Stab final assembly

H. Stab. Skinning - Note poor edge alignment)

H. Stab. Skin Alignment Repair - Note Doublers

Tough aligning top skin stb. It is either flat at trailing edge with bulge at the center of the end rib or nicely fitted at the end rib with dimple and small ripples at the trailing edge. Roger (Zenith ) and Jon (HomeBuiltHelp) suggest best fit. I added a doubler L-angle to help smooth the dimple. Added a non functional doubler on the port side for symmetry. Still has slight oil-can effect, but much better with the doubler. Drilled and clecoed (copper). Ready for removal, deburr, corrosion protection, re-strap, re-cleco, and riveting.

Saturday, January 31, 2015

H. Stab hinge bracket & top skin final preparation


H. Stab. after rebuild

Rebuilt H. Stab. & applied RustOx to bottom interior and H. Stab structure. Prepared center hinge bracket & gusset for install. Constructed center hinge installation tool(7-H-5).

Tuesday, January 27, 2015

H. Stab. Bottom Skin



Laid out center-lines on bottom skin surface. Aligned skin to rear spar and drilled and clecoed (silver) in preparation for strapping (5 straps) to evenly pull the skin over the structure. Verified alignment across front spar and ribs, then drilled out for silver clecos. Strapping process is difficult with just one person. However bottom skin alignment is good around the nose and curved surfaces

Monday, January 26, 2015

H. Stab. Structure (7H0) Ready for Skinning



H. Stab structure(7H0) and attachments drilled, (#40) deburred, and ready for skinning

Sunday, January 25, 2015

H. Stab. Rear Spar layout & mate with Front Spar







Rear spar layout (doublers & ribs). Drill & cleco (silver) H. Stab Rear spar. Mate front & rear.

Saturday, January 24, 2015

Layout H. Stab. - Front Spar




Front Spar layout (doublers & ribs). Drill & cleco (silver) front Hor. Stab front spar.