Wednesday, February 25, 2015

Firewall (7F7-1) Layout for Viking Steel Nose-Wheel Spring

Firewall & Viking Steel Spring Nose Gear Components (Powder Coated)
Cold-snap. Worked in office on firewall components lay-out. Scribed firewall (7F7-1) reference lines. Scribed rivet lines on vertical lower channel (7F7-2C), vertical top channel (7F7-3) left & right firewall stiffeners (7F7-5), and top channel stiffener (7F7-7SP). Scribed rivet locations and bungee pin holes locations in left & right channel doublers (7f7-8C). Verified pre-drilled left & right gear gussets (7F7-9C). Since I am replacing the elastic bungee supplied with the Viking steel bungee, laid out locations for 9mm mounting holes for the upper viking gear assembly on the upper channel (7F7-1SP). The upper channel supplied with my kit came pre-drilled for the spring/gear-tube assembly. Dis-assembled the Viking spring assembly, primed, and painted mounting legs and spring.

No comments:

Post a Comment