| Pre-Install Trial Fit Nose-Gear to Firewall |
Showing posts with label Gear. Show all posts
Showing posts with label Gear. Show all posts
Sunday, March 1, 2015
Pre-Install Firewall/Nosegear Spring Assembly
Saturday, February 28, 2015
Firewall Modification for Viking Steel Spring
Drilled out and added doubler to 7F7-1SP firewall upper channel to accept Viking "steel bungee". Installed upper nylon bearing into upper channel with 4 AN3-6A bolts.
Wednesday, February 25, 2015
Firewall (7F7-1) Layout for Viking Steel Nose-Wheel Spring
| Firewall & Viking Steel Spring Nose Gear Components (Powder Coated) |
Subscribe to:
Posts (Atom)