Saturday, February 28, 2015
Firewall Modification for Viking Steel Spring
Drilled out and added doubler to 7F7-1SP firewall upper channel to accept Viking "steel bungee". Installed upper nylon bearing into upper channel with 4 AN3-6A bolts.
Wednesday, February 25, 2015
Firewall (7F7-1) Layout for Viking Steel Nose-Wheel Spring
| Firewall & Viking Steel Spring Nose Gear Components (Powder Coated) |
Tuesday, February 24, 2015
Starboard Outboard Slat Construction
Installed
ribs end ribs in stb outboard skin. 1st to #40 (silver) then to A4,
Removed all ribs, deburred, and applied corrosion protection. Re-clecoed
in place, and riveted. Ready to place on slat jig to drill/cleco top
skin to ribs
Monday, February 23, 2015
Layout & start construction of Starbaord Slat Pair
Installed
ribs end ribs in stb outboard skin. 1st to #40 (silver) then to A4,
Removed all ribs, deburred, and applied corrosion protection. Re-clecoed
in place, and riveted. Ready to place on slat jig to drill/cleco top
skin to ribs
Saturday, February 21, 2015
Completed Port Inboard Slat (7S1)
| Port side Slat pair (inboard & outboard) |
Friday, February 20, 2015
Underside Port Inboard Slat (7F0)
Completed installation of final (outboard slat rib (with flanges) onto bottom skin. Strapped assembly to underside of slat jig with flanges through slots in jig and strapped to position skin properly over the curve of the slat ribs. Drilled and clecoed (silver). Ready to drill out to A4
Thursday, February 19, 2015
Port-Inboard Slat (7F1-2) Skinning
| Port-Inboard Slat (7S1-2) Underside Skin |