Saturday, February 28, 2015
Firewall Modification for Viking Steel Spring
Drilled out and added doubler to 7F7-1SP firewall upper channel to accept Viking "steel bungee". Installed upper nylon bearing into upper channel with 4 AN3-6A bolts.
Wednesday, February 25, 2015
Firewall (7F7-1) Layout for Viking Steel Nose-Wheel Spring
Firewall & Viking Steel Spring Nose Gear Components (Powder Coated) |
Tuesday, February 24, 2015
Starboard Outboard Slat Construction
Installed
ribs end ribs in stb outboard skin. 1st to #40 (silver) then to A4,
Removed all ribs, deburred, and applied corrosion protection. Re-clecoed
in place, and riveted. Ready to place on slat jig to drill/cleco top
skin to ribs
Monday, February 23, 2015
Layout & start construction of Starbaord Slat Pair
Installed
ribs end ribs in stb outboard skin. 1st to #40 (silver) then to A4,
Removed all ribs, deburred, and applied corrosion protection. Re-clecoed
in place, and riveted. Ready to place on slat jig to drill/cleco top
skin to ribs
Saturday, February 21, 2015
Completed Port Inboard Slat (7S1)
Port side Slat pair (inboard & outboard) |
Friday, February 20, 2015
Underside Port Inboard Slat (7F0)
Completed installation of final (outboard slat rib (with flanges) onto bottom skin. Strapped assembly to underside of slat jig with flanges through slots in jig and strapped to position skin properly over the curve of the slat ribs. Drilled and clecoed (silver). Ready to drill out to A4
Thursday, February 19, 2015
Port-Inboard Slat (7F1-2) Skinning
Port-Inboard Slat (7S1-2) Underside Skin |
Wednesday, February 18, 2015
Port-Putboard Slat (7S1-3) Ribs Installed
Completed installation of final (outboard slat rib (with flange) onto bottom skin. Strapped assembly to underside of slat jig with flanges through slots in jig and strapped to position skin properly over the curve of the slat ribs. Drilled and clecoed (silver). Ready to drill out to A4.
Tuesday, February 17, 2015
Port-Inboard Slat Ribs installed (7S1-2)
Monday, February 16, 2015
Layout & Preparation of Slat Ribs (7S1)
Slat Rib Assemblies (7S1) |
Located, identified, and marked all slats parts for build of all 4 slat sections. 2 short inboard skins (port & starboard) and 2 longer outboard skins. 6 left and 6 right ribs, (3 each section). Center ribs for each section are unmodified. All others require left and right copies of slat mounting flanges and doublers from L-angle slotted and curved to match contour of inside of slat rib. Completed mods to 1 set of slat ribs.
Sunday, February 15, 2015
Elevator Trim Tab
Installed the male-end of a 5-pin waterproof connector on length of 8-wire cable & matching female-end to the 4 wires of the elevator trim servo cable. Cable connector will be located in the aft fuselage (added to aid installation/removal of h. stab & elevator structure mating to fuselage). Added the male-end of a 2-pin waterproof connector to 2 of the remaining 3 wires in the 8-wire cable and matching female-end to the 2 wires of the tail-light assembly ready for mounting in the rudder. The last wire (8th, orange) of the cable is unused. These connectors work well in marine applications and I have several more 2-pin connectors to be used in installing the wing-tip navigation/position lights, angle-of-attack sensor, fuel level transmitters, and possibly a landing light
Friday, February 13, 2015
Install Elevator Control Horn to Complete H. Stab. & Elevator Mating
Elevator Horn (7H5) Mounting |
H. Stab., Elevator, & Trim Tab with Controls & Hinges |
Final placement of elevator control horn mating elevator to h. stab. Completed several bracing structures on top and bottom of both h. stab and elevator. All a5 rivets. Laid out positioning of outer hinge locations. Drilled hing pins (tough job: 1/16" dia, hole in 3/16" dia. pin). Primed and painted 4130 steel hinge pins, and installed on outer elevator ribs with A5 rivets. Outer hinge plates on h.stab will be drilled out and riveted (A5) at a later time to facilitate dis-assembly of the structure for mounting to aft fuselage.
Thursday, February 12, 2015
Install the Electronic Trim Servo Option (ETO)
Installed the male-end of a 5-pin waterproof connector on length of 8-wire cable and matching female-end to the 4 wires of the elevator trim servo cable. Cable connector will be located in the aft fuselage (added to aid installation/removal of h. stab & elevator structure mating to fuselage). Added the male-end of a 2-pin waterproof connector to 2 of the remaining 3 wires in the 8-wire cable and matching female-end to the 2 wires of the tail-light assembly ready for mounting in the rudder. The last wire (8th, orange) of the cable is unused. These connectors work well in marine applications and I have several more 2-pin connectors to be used in installing the wing-tip navigation/position lights, angle-of-attack sensor, fuel level transmitters, and possibly a landing light
Mating the H. Stab. and Elevator Sections
H. Stab. & Elevator - Port/Pilot Side (inverted) |
H. Stab. & Elevator - Starboard/Passenger Side (inverted) |
Final placement of elevator control horn mating elevator to h. stab. Completed several bracing structures on top and bottom of both h. stab and elevator. All a5 rivets. Laid out positioning of outer hinge locations. Drilled hing pins (tough job: 1/16" dia. hole in 3/16" dia. pin). Primed and painted 4130 steel hinge pins, and installed on outer elevator ribs with A5 rivets. Outer hinge plates on h.stab will be drilled out and riveted (A5) at a later time to facilitate dis-assembly of the structure for mounting to aft fuselage
Wednesday, February 11, 2015
Elevator Controls Installation
Elevator Control Horn (7H5) Installation (top) |
Elevator Control Horn (7H5) Installation (bottom) |
Initial positioning & installation of elevator control horn. Drilled out to #30 - final assembly will be A5. (Note one AN3 bolt in horn mount to H.stab rear spar. Air drill slipped when drilling out A4 to A5 resulting in concentric A5 hole. Drilled out and replaced with AN3-4 bolt and celastic nut.)
Elevator Riveted & Ready for Horn Installation
Tuesday, February 10, 2015
Elevator (7H5) Trim & Controls Installation
Elevator Controls Mount Area - Underside |
Elevator Controls Mount Area - Topside |
Removed elevator straps and skin from structure. Installed elevator trim tab and servo. Laid out and cut away areas for control horn and rudder travel. Re-strapped and clecoed skin in preparation for drilling out to A4 and riveting. |
Sunday, February 8, 2015
Elevator Top Skin (7H5)
Saturday, February 7, 2015
Elevator Bottom Skin
Install Elevator Center Spar (7H1-4)
Installed the elevator center spar (short, 7H1-4) and remaining ribs in preparation for skinning process
Friday, February 6, 2015
Elevator (7H4) Parts Preparation & Layout
Thursday, February 5, 2015
Pickup Powder Coated Steel Parts
Alex (A1 Powder Coating) did a great job of flat black on all the 4130 parts & the firewall.
Wednesday, February 4, 2015
H. Stab. Center Hinge Install (7H3)
Tuesday, February 3, 2015
H. Stab Ready for Hinge Assemby Install
Monday, February 2, 2015
Completed H. Stab. (7H3)
Removed copper clecos, deburred all holes, and applied RustOx. Sprayed on the diluted RstOx with the small Kobalt gravity-fed gun. Re-strapped, re-clecoed, and riveted the structure, which is now ready for center center hinge assembly and cutouts for control cables
Sunday, February 1, 2015
H. Stab final assembly
H. Stab. Skinning - Note poor edge alignment) |
H. Stab. Skin Alignment Repair - Note Doublers |
Tough aligning top skin stb. It is either flat at trailing edge with bulge at the center of the end rib or nicely fitted at the end rib with dimple and small ripples at the trailing edge. Roger (Zenith ) and Jon (HomeBuiltHelp) suggest best fit. I added a doubler L-angle to help smooth the dimple. Added a non functional doubler on the port side for symmetry. Still has slight oil-can effect, but much better with the doubler. Drilled and clecoed (copper). Ready for removal, deburr, corrosion protection, re-strap, re-cleco, and riveting.
Subscribe to:
Posts (Atom)