Fuel tank bay channel |
Basic wing structure (Note tip nav/pos light wires) |
Completed most of the basic wing structure by installing the fuel tank channel (7V11-2K) and the front spar tip (7V3-3). All clecoed. Horizontal & longitudinal stiffeners will be added prior to tank installation & skinning. Lots of drilling out to #30 and deburring in the future.
No comments:
Post a Comment