Monday, March 23, 2015

Installed fuel tank channel (7V11-2K) & spar tip (7V3-3)


Fuel tank bay channel



Basic wing structure (Note tip nav/pos light wires)

Completed most of the basic wing structure by installing the fuel tank channel (7V11-2K) and the front spar tip (7V3-3).  All clecoed. Horizontal & longitudinal stiffeners will be added prior to tank installation & skinning.  Lots of drilling out to #30 and deburring in the future. 

No comments:

Post a Comment