Thursday, March 26, 2015

Prepare wing for longitudinal stiffeners


Wing structure in vertical position in order to install longitudinal stiffeners
Placed stb. wing topside down (still clecoed) on 2" sq. steel channels and started preparations for installing the bottom horizontal stiffeners between the ribs.  Much roll-out/roll-up positioning of top skin.  Able to get good fit and start drilling front spar/skin #40 and clecoing.

No comments:

Post a Comment