Positioned Bottom-Center Skin (7V7-3) on Structure
Verified alignment of front edge against front spar Drilled & clecoed #40 approximately every 3rd hole in the skin/structure. Much rolling/unrolling will be required to install longitudinal stiffeners.
No comments:
Post a Comment