Wednesday, April 22, 2015

VDO Sensor Installation Complete


Fuel level sender installed.  Note grounding wire & liquid gasket seal

Liberally apply Form-a-Gasket compound between the rubber gasket and the tank wall to assure a tight seal.  Add additional liquid gasket material around the outside perimeter of the tank/sender.

Make the sending unit and grounding electrical connections.  The ground is made at both the aluminum wing ribs/spar structure and at the folding-wing mechanism hinge plate at the bottom of the wing at rib 1.

No comments:

Post a Comment